Note: All price and other data in this document are for reference only. Actual prices, delivery dates are subject to change depending on order quantity, composite structures and service contents, and shall be governed by the formal sales contract.
Aerogel blanket roll: 68061000 / 68069000 (mineral thermalinsulation products) Aerogel powder: 28112200; 38249999 (other chemical products) Water-based thermal-insulating coating: 32099000 / 3210000090
The table below applies to trade with Kazakhstan for delivery to Almaty Station. Base product: aerogel blanket roll, 10 mm thickness, density 160 kg/m³, hydrophobic glass-fiber reinforced, single-sided aluminum-foil lamination, thermal conductivity λ≤0.018 W/(m·K), Class A1 noncombustible. For thermal-power and petrochemical projects in Almaty, Kazakhstan. For full 40HQ container orders. Prices for small-batch orders will increase by 15%~25%. Conversion note: for 10 mm thickness, 1 ㎡ = 0.01 m³.
|
Item |
Specification |
FOB Reference Price (bare blanket) |
Minimum Order Quantity |
Packaging |
|
Standard aerogel blanket roll |
Thickness: 3/6/10 mm; width: 1500 mm; length: 10 m per roll |
USD 20~25 /㎡; lower price for 3 mm; higher price for 10 mm |
50 ㎡ |
Inner PE waterproof film, outer woven bag, palletized |
|
Aluminum-foil laminated blanket roll |
3/6/10 mm, single-sided aluminum-foil composite |
USD 26~35 /㎡ |
50 ㎡ |
PE film + woven bag + wooden pallet; moisture-proof & scratch-resistant |
|
PET-film laminated dust-proof blanket roll (preferred for lithium-battery retrofitting) |
3/6 mm, double-sided PET lamination for dust suppression |
USD 42~50 /㎡ |
100 ㎡ |
Sealed PE film + carton + pallet; dust-proof, for battery-box lining & sewn thermal-insulation jackets |
FOB Terms: Delivery at factory / inland port. Buyer is responsible for international rail freight, insurance and Kazakhstan customs clearance. Reference transaction price: USD 20~25 /㎡. Included: tax-inclusive ex-works material cost, export-grade packaging, delivery to Fangshan Inland Port, domestic export customs declaration and documentation. Excluded: international block-train freight and all overseas-segment expenses.
DAP Terms: Delivered at Almaty Station. Reference transaction price: USD 26~35 /㎡. Included: material cost, domestic short-haul transportation, inland-port warehousing & handling, domestic export customs declaration, international rail freight from Fangshan to Almaty, cargo insurance and freight-forwarder handling fees.
✅ Valueadded secondary-processing services (extra charges apply)
Reference lead time: upon contract signing, for standard-stock items and composite / deep-customized orders: 18~25 working days. Delivery can be arranged under FOB or DAP terms.
Water-based aerogel therma-insulating coating, applicable by spraying, roller-coating or troweling. Suitable for special-shaped components, storage-tank outer walls, pipeline outer surfaces, building walls and anti-condensation works.
|
Item |
Specification |
FOB Reference Price |
Minimum Order Quantity |
Packaging |
|
Aerogel thermalinsulating coating |
Waterbased, solid content ≥40% |
USD 9~12 /kg |
200 kg |
20L plastic drums, pallet stacked |
Reference lead time: upon contract signing, for standard-stock items and composite / deepcustomized orders: 18~25 working days. Liquid coating is classified as chemical goods for export. MSDS and transportationidentification report are mandatory documents. Delivery can be arranged under FOB or DAP terms.
Hydrophobic silicon-dioxide aerogel powder; particle size 10~40 μm. Used as functional additive for coatings, thermal-insulating mortar and rubber-plastic materials.
|
Item |
Specification |
FOB Reference Price |
Minimum Order Quantity |
Packaging |
|
Hydrophobic aerogel powder |
SiO₂ ≥98%, hydrophobic |
USD 32~42 /kg |
50 kg |
Aluminumfoil vacuum bags (10 kg per bag), packed in cartons; ton-bags for bulk orders |
|
Hydrophilic aerogel powder |
SiO₂ ≥98%, hydrophilic |
USD 30~40 /kg |
50 kg |
Aluminum-foil vacuum bags, packed in cartons |
Reference lead time: upon contract signing, for standardstock items and composite / deep-customized orders: 18~25 working days. Powder is highly moisture-absorbent. Sealed vacuum packaging shall be adopted throughout the whole process with strict moistureproof measures. Delivery can be arranged under FOB or DAP terms.
Class A1 fire-resistance test report, thermal-conductivity test report, commercial invoice, packing list, certificate of origin, etc.